EASERGY T200 PDF

EASERGY T200 PDF

MV electrical network management MV substation control unit Merlin Gerin Easergy range Easergy T I User’s manual Easergy T I Contents Overview . Download: Easergy T P (series 3) User’s manual – Easergy TP. Easergy T I user manual – Schneider Electric. ic. dk. Views. 4 years ago. Module, · Enclosure, · Automation, · Interface.

Author: Samukus Negore
Country: Madagascar
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 5 September 2018
Pages: 499
PDF File Size: 9.11 Mb
ePub File Size: 13.40 Mb
ISBN: 271-2-25002-505-5
Downloads: 9609
Price: Free* [*Free Regsitration Required]
Uploader: Goltiran

The existing variables of the T that can be used in the programmes are: AC supply 9 — Cable gland: Maximum random time-out for sending an alarm to the Scada. Availability date to easeryy confirmed.

Easergy T P – Schneider Electric

Multi-channel SCADA communication Three available communication ports Easergy T P can manage up to three communication ports and ensure multisite redundant communications. Host tel number standby: P, S, Q, cos j, f, active and reactive energy Measurements and functions with PM6 type switch Fault memorisation Memorised faults can be cleared: Files download — Diagnostic pages 18 A Files download sub-menu allows these logs to be saved to the PC in the form of Excel-compatible files.

An indicator lamp can be connected to each group of four ways, or a single indicator lamp can be connected to the entire enclosure. Automatic setup time PC time Date: Reliable and rugged In view of difficult environmental conditions and the operational availability required, Easergy T P has undergone strict reliability and qualification testing in accordance with IEC international standards.

PEEN Monitoring page Monitoring page The screen on the left shows an example of a 1-channel Easergy T P, with internal fault detector option, provided with a current acquisition card and a transformer for voltage measurement.

Easergy TI/TE | Schneider Electric

Replacing the Communication module a Power down the enclosure see the previous pageb Release the two locking screws and remove the Communication module from its housing, c Insert the new module, locking it in position, d Power up the enclosure.

  3M MPRO150 PDF

F Air insulated switchboard 1 to The main menu is displayed. The Voltage Time VT automation system is used with some switches which do not have current sensors and which do not allow the network to be reconfigured using the sectionaliser automation system. A battery fault alarm informs the remote control system of an imminent discharge. EMEN Examples of typical applications that can be created with the calculation formulas: When the maximum number is exceeded, the oldest event on the list is erased by the most recent one.

SW1 current 2 — 4-pin plug-in connector: Power supply characteristics AC power supply b Supply voltage: Operation b The line is powered and the switch is closed b The automation system sends an opening order t00 Dial up delay time: Improving distributed power quality b Precise information about transient and permanent faults enables corrective and preventive maintenance measures to be taken to reduce the recurrence of faults.

It operates independently using power supplied by the T A slide-mounted support offers various adjustment possibilities.

Easergy T200I/T200E

DEEN Position of the polarizing pins: This file can be used to configure one or more other substations in the same way without being obliged to reconfigure all the parameters one by one. TM1 depends on the variable depends on the variable TM No.

A universal control unit that can be adapted to your system, data communications networks and requirements. Voltage loss validation time delay toms ms in 10 ms steps.

They can also be type: The state of the control is refreshed on screen automatically as soon as it is completed. A session with at least this access right will allow viewing of this variable Reverse gives an order with control complementarity e.

  HEIDEGGER CASSIRER DAVOS PDF

CPU 1 PowerMeters installed: Plug the 4-pin connector into the Current Acquisition card for the appropriate way at the bottom left-hand side of the enclosure see the Interface card illustration eaxergy 7. Easergy T P General view: This can be used to evaluate the improvement in service quality: However, this type of battery has its limitations: Switchgear control-command Management of different types of predefined switches: If the fault persists, replace the Communication module Press the Reset button on the Power supply module If the LED does not go out after a few seconds, replace the Communication module 23 Maintenance Other diagnostics Events Events loss Solution If the problem recurs, replace the T CPU card Operation orders not executed 24 Possible causes If fewer than events are stored, an event storage problem has occurred More than events stored The switch order was not executed Normal operating conditions apply Check: A drilling template supplied with the enclosure f200 used to determine where to drill the holes required to mount the enclosure.

g200

RS Modbus local network Management of 3 virtual IP addresses or ethernet port Management of the various transmission modes The ports can be configured to be used with single or redundant channels: Two pages allow this configuration: The event dating is 1 ms. Check the charger and the easeggy. Earthing d The equipment must be earthed to ensure E.

Three versions are available in the range. It can be set from the configuration PC, or from the remote control station if this function is available.

Cable glands for cable entry.