DVGW ARBEITSBLATT G 491 PDF

DVGW ARBEITSBLATT G 491 PDF

Beiblatt Zum Dvgw-Arbeitsblatt G Gas-Druckregelanlagen Fuer Eingangsdruecke Bis Einschliesslich Bar; Planung, Fertigung, Errichtung. within the DVGW Gas Innovation Campaign which includes additional tests .. [ 10] DVGW, Hrsg., Technische Regel Arbeitsblatt DVGW G (A) Juli Insbesondere sind die DVGW-Arbeitsblätter G , G und G zu beachten. Umbau, Ersatzteile. Jegliche technische Veränderung ist untersagt.

Author: Meztizil Dilrajas
Country: Sao Tome and Principe
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 1 June 2013
Pages: 77
PDF File Size: 8.29 Mb
ePub File Size: 16.56 Mb
ISBN: 339-7-45683-189-8
Downloads: 88366
Price: Free* [*Free Regsitration Required]
Uploader: Mekus

The DVGW’s technical regulations for the installation and operation of gas supply piping and facilities specify provisions for the pressure testing methods to be applied with reference to this code of practice. The gas pressure regulating and -messanlage invention has the following advantages: The measurement, the control device and the blocking device are designed such that they can be traversed by two flow directions.

The object of the invention accordingly is to provide a GPRM plant for bidirectional operation, which requires little technical effort and their footprint is small.

Wherever possible, the test sections should not exceed a length of 15km or a volume of 3, m. Pure-water supply system – has insert in ring main reducing pressure with pipe connected. The wiring harness is direct, ie, connected to the two line networks without the use of elaborate Reversierungs-line system.

DVGW List – @ 제품시험 / 인증대행@-ASTM, BS, MIL, DIN, EN, Automotive 규격시험

In the first line network can, for example, be a transmission system, usually prevails in which a transport pressure of about 60 bar. Usually GPRM plants for the unidirectional operation are provided, ie, the gas pressure regulator and the gas-measuring device are only flows from one direction.

  ANELIDOS POLIQUETOS PDF

The GPRM system includes a measuring device for measuring the flow. There are cascaded two ultrasonic gas meter to compare the two results and to ensure high measurement accuracy arbeitsbblatt billing arbfitsblatt in continuous operation.

Overview of pressure testing methods Fig. Die Filter the filters 10a 10a. Eine Regeleinrichtung A control device 8 8th regelt den Durchfluss und den ausgangsseitigen Druck Transportrichtung.

An beiden Enden des Areitsblatt At both ends of the operation wire bundle 1 1 befinden sich Absperreinrichtungen are shut-off devices 5a 5a. Method for regulating the gas pressure in a gas pipeline network, gas pressure regulating stations in a gas pipeline network and rotary piston machine.

In this particular code of practice, the pressure testing methods applied for gas supply piping and facilities are systematically compiled and described. Device for supplying haemodialysis apparatus with fluid – has two channels with one at high pressure arbeitsblaft other at low, with high pressure channel used for withdrawing dialysis fluid and low pressure channel for returning surplus fluid from high pressure channel.

The sequence in xrbeitsblatt B2 is depicted schematically in Fig. Method for the detection of changes of a prescribed geometry of a pipe network being flowed through. In a business or official metrology calibrated measuring devices have to be used. To measure the temperature on the pipe wall, thermometers located at intervals of 2. With respect to all visual methods, the pipeline or facility under test shall be exposed; in particular, joints on piping, fittings, valves, vessels, etc.

  GEOVISION 8.5 MANUAL PDF

Piston Pressure Gauges B 3. With respect to the pipe wall temperatures along the buried part of the test section, it is generally sufficient to take thermometer readings at intervals of sixhours.

DE102005062161A1 – Gas pressure regulating and -messanlage – Google Patents

Idostatic Testing Method B 1 Pressure applied once Unauthorised TranslationThis translation is not authorised by the issuing organisation and is for internal use only. Bei dem zweiten Leitungsnetz kann es sich um das Leitungsnetz eines regionalen Versorgungsunternehmens handeln. By advantageous embodiments undue repercussions between control and measurement devices be prevented while minimizing the pressure drop across the system.

Identical components are provided with the same reference numerals. Gas pressure regulating and -messanlage according to any one of claims 1 to 13, characterized in that the gas pressure regulating and -messanlage comprises a device for determining gas quality.

Typical instruments are iris, displacement, turbine, ultrasonic and eddy gas meters. The relevant sections about testing methods B1, B2, B3 and C3 refer to other necessary measurement devices and their respective requirements. The change in volume of the test section can be established from the following equation: The GPRM plant is built in a dvyw train construction.

In the second line network, it may arbeitsblaht the water mains of a regional utility company. A special test rig e.

Previous post: