CPWD PLINTH AREA RATES 2012 PDF

CPWD PLINTH AREA RATES 2012 PDF

Plinth Area Rates of CPWD – Download as PDF File .pdf), Text File .txt) or read online. RG Segaran. PWD (W.B.) SCHEDULE OF RATES, Uploaded by. Building Schemes during the year are approved and furnished in Annexure I, II, III, IV I PLINTH AREA RATES FOR THE YEAR FOR THE PREPARATION OF ROUGH COST ESTIMATE.j. .. Plinth Area Rates of CPWD. CPWD PLINTH AREA RATES YEAR BASE CPWD Cost Index Calculation at Delhi on different dates Base Year Base

Author: Yozshulkis Fenrikora
Country: Burma
Language: English (Spanish)
Genre: Spiritual
Published (Last): 22 July 2004
Pages: 29
PDF File Size: 13.20 Mb
ePub File Size: 3.20 Mb
ISBN: 568-2-68992-172-6
Downloads: 97649
Price: Free* [*Free Regsitration Required]
Uploader: Kazile

Plinth area rates pdf

They are based on the fundamental principle that the plinth area of a building should present a true picture of the covered floor area provided in the plan. O of Income-tax department for V. Wed Jun 11, This does not include the cost of land. For a future date material and labor prices for any place is obtained and cost index is arrived thus: Yes Yes Yes Note: Pressed steel frames made out of corrosion resistant coated sheet of 1.

Architectural bonds, cornice etc. Rest of the area white or colour wash. In lacs for each additional floor Rs.

Travel Doors Control 3 4 5 6 7 8 Price Addl. Copy of Cost Indices Haryana Base Waste coupling in wash basins plitnh grating over the floor trap shall be only of PTMT.

  AMERICAN MANHOOD ROTUNDO PDF

Soap rack Nitch in W. The asessee can obtain a Valuation Report suo-moto from a Registered Valuer to substantiate his claim.

Valuers World :: View topic – CPWD Plinth Area Rates Year Base

Lavotory blocks staircase, lavatory blocks corridors and other rooms except in-situ mosaic stores, weather-maker rooms etc. Type —IV Foundation Bearing capacity 10 tonnes per sq. Water-proofing treatment 4 course treatment finished with brick tiles. DAR Electrical contains most of the items of.

The difference between declared and estimated V. Under some circumstances with such conditions, the V. External sliding door bolt and handles will be in powder coated M. I am sure that this PAR will be very useful to all concerned.

The Delhi Analysis of Rates Electrical is a comprehensive and We share information about your activities on the site with our partners and Google partners: Synthetic enamel paint on all wood work and steel work. See illustrative sketch below: To change from Delhi base to future date in any place in India, the enclosed calculation sheet can be used to arrive at future cost index. The latest plinth area rates as on 1.

Therefore, stakes are high Same as Type I to III except that panelling will be of both side decorative, pre-laminated particle board. Tue Mar 11, Open platform without parapets and terraces at ground floor and porches, shall not be included in the plinth area but shall be allowed for separately for costing purposes.

  JOELY SKYE MARKED PDF

Cost of bulk services water supply, sewage disposal e.

Delhi Civil Works Cost Indices to Rules for working out ;linth area from plans In order to ensure the adoption of a uniform method of working out plinth areas from plans, the following rules are laid down. Copy of Cost Indices West Bengal. Same as Type 1 to III. D Skelton and subsequent order,issued p,inth Supplying, installation, testing and commissioning of Building management system etc.

Blusmiddelen en nooduitgangen nooit blokkeren! Proforma for calculating cost index for future cost index with base as on 1. Rest either colour or white wash.

central pwd plinth area rates (1.10.2012) – CPWD

Punjab PWD Code by occasional updating. Description Unit Rate as ratew 1. Koba treatment on roofing in all type of quarters. Main entrance hall, OPD Plastic emulsion paint or the like.

The official amendments to this document wouid be pubiished by the IRC Rates for items are applicable on entire plinth area except for items 1. These rates will apply to normal conditions and normal layout plans. Afea Aug 31, 7: O can refer to Valuation Officer V. High Level Bridge, Soriankuppam.

Glazed tiles of size not less than x mm in dado.